Thanks Thanks:  0
Likes Likes:  0
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Page 2 of 2 FirstFirst 12
Results 16 to 19 of 19
  1. #16
    Join Date
    Feb 2006
    Location
    Melbourne
    Age
    66
    Posts
    499
    Post Thanks / Like

    Default

    Quote Originally Posted by gregt View Post
    Here's another bit of advice I was given today from the Paint Place. "You should not undercoat new Gyprock for 6 weeks!" I didn't want to argue with the lady because she was quite a hotty

    Any thoughts on that one?

    Greg
    Hi Greg,

    I will be painting (sealing) gyprock sometime in the next 3 weeks so I was interested to know if that comment was true. However, I went onto the CSR home page and got a PDF file (on the link below) about the material but I didn't see anything about leaving it for 6 weeks. I will send an email to their technical department (within the next fortnight) to clarify the remark.

    http://www.gyprock.com.au/technical/...958A4CE598.pdf

    In the meantime can anyone else give an opinion on which sealer is best?, or have all the painters given their opinion?

    Cheers
    MH

  2. #17
    Join Date
    Aug 2004
    Location
    Perth WA
    Posts
    355
    Post Thanks / Like

    Default

    The literature says "make sure the joint treatment is thoroughly dry before applying a sealer".

    Lets face it, the muck has to be thoroughly dry before it can be sanded.

  3. #18
    Join Date
    Feb 2006
    Location
    Melbourne
    Age
    66
    Posts
    499
    Post Thanks / Like

    Default

    Quote Originally Posted by rod1949 View Post
    The literature says "make sure the joint treatment is thoroughly dry before applying a sealer".

    Lets face it, the muck has to be thoroughly dry before it can be sanded.
    That is why we presently have our 2 oil heaters in our laundry and toilet so when the plasterer returns tomorrow morning it will hopefully be totally dry.

  4. #19
    Join Date
    Aug 2004
    Location
    Perth WA
    Posts
    355
    Post Thanks / Like

    Default

    Quote Originally Posted by Metal Head View Post
    That is why we presently have our 2 oil heaters in our laundry and toilet so when the plasterer returns tomorrow morning it will hopefully be totally dry.

    Well thats blown our carbon credits. Yep I know what you mean, where I've laid the muck on a bit heavy its taken at least 2 days to dry.

Similar Threads

  1. Wet gyprock
    By Timbo's Shed in forum PLASTERING
    Replies: 5
    Last Post: 29th April 2007, 10:52 PM
  2. how do i gyprock up a window?
    By transit in forum DOORS, WINDOWS, ARCHITRAVES & SKIRTS ETC
    Replies: 10
    Last Post: 29th November 2006, 08:30 AM
  3. Tiling on damaged gyprock
    By John NW in forum TILING
    Replies: 5
    Last Post: 5th February 2006, 07:15 PM
  4. Rott in Gyprock
    By DavidC in forum PLASTERING
    Replies: 1
    Last Post: 24th September 2005, 11:10 PM
  5. Gyprock lining for garage
    By haph in forum PLASTERING
    Replies: 9
    Last Post: 26th May 2005, 10:48 AM

Tags for this Thread

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •