Originally Posted by ptyltd
I'd be inclined to cut a temporary spoon drain around the perimiter to minimise the under floor moisture ingress. After all, it's better to do it now than have the floor fail later on.Hooroo.
Regards, Trevor
Grafton
-
31st July 2006, 06:24 PM #17
Because you have 3 sides that are open, you will have enough subfloor ventilation to carry of any relative humidity out. However it would be safe to astrevor sugested to dig a spoon drain around the house to redirect any ponding away from the cavity.