Standard bricklayer rates
Does anyone have an idea what a standard rate for bricklaying would be?
I need a small job, just a simple 7m long x 3m high wall.. For a bricklayer it's a simple job, the only thing that would slow them down is that it's on the boundary and the frame is up, so they have to lay it through the frame. No big deal though.
I already have the bricks, and am amazed at some of the quotes just for the labour. It's about 1000 bricks or so, I reckon they'll be done in a day, and that's what most of them have said.
I've had absurd quotes. Possibly because it's a small job.
I even offered to pay cash off the books, but still the quotes are ridiculous.
So, what's a fair price per hour, per day or per bricks or whatever?
Should I just concede defeat and pay the price, or keep looking around. I'm tempted to give it a go myself, but can't justify it, because it will take me much longer than a day.
Cheers.
-
15th April 2006, 10:05 PM #2
Last time I looked at the non mates rates for bricks, it worked out that I'd be paying about $2.00 per brick (includes cost of cheap bricks). A lot of the more itinerant (read 'able to move interstate') tradies have gone up to Qld.
It can also depend on how attractive you make it as a one day job - is it all there (footings, sand) ready to go, or do you need them to arrange excavations and concrete and reinforcing...this takes a bit of the shine out of a cash job.
-
16th April 2006, 11:15 AM #3
sounds like the rate you need to pay is the rate asked by the brickie.
I imagine most wouldn't want it coz of stuffing around laying bricks through the frame. Sounds like a real prawn of a job.
-
16th April 2006, 11:42 AM #4
Originally Posted by echnidna
Why does it sound like a stuffed up ownersbuilder's job.:confused:
Peter.
-
16th April 2006, 12:01 PM #5
Hello encino.I am a bricklayer by trade and the rates per 1000 bricks here in Wagga Wagga are around 80cents per brick($800 per 1000)plus extras.Actually the job you are describing doesn't sound too attractive to me either as it is not all that easy going laying bricks overhand through a timber stud frame with the noggins etc in your way.I'm sure someone will do it but they will want to earn what they normally do for a day's work I would think.
-
16th April 2006, 12:43 PM #6
How are you going to get the sisalation on to the stud wall?
Tools
-
16th April 2006, 12:49 PM #7
does the outside of the brickwall have to be cleaned and raked, which goes back to the above question can u get access from the nieghbors yard.
-
16th April 2006, 04:23 PM #8
Thanks for the replies.
Footings are all down, all it needs is someone to stick the bricks on top.. hopefully in a fairly straight manner
It doesn't need to be cleaned next to the fence, only for the 60cms or so that sticks above the fence, but the neighbours will allow access for that.. they just don't want to pull the fence down. The carpenter insisted on having the frame up first because it was pre-fab and he didn't want to muck around with matching the frames in with the ties.
I guess I'm in the wrong profession Terry!... $800 for a day's work (cash in hand) sounds bloody good to me. Maybe I should do an apprenticeship.
-
16th April 2006, 04:36 PM #9
I can do it on Tuesday for you.
$4000 cash, half up front.
I have 3 blokes on stand by.
Let me know and I will PM you my phone number.
Owwwhh, and I will supply cement in that price too.
Al
-
16th April 2006, 04:38 PM #10
This is not a job u can price per brick, to get it done in a day u will need 2 blokes and they will supply the combo and wall ties. So $800 is quite a resonable price!
-
16th April 2006, 05:16 PM #11
Originally Posted by ozwinner
-
17th April 2006, 08:36 AM #12
Actually encino you wouldn't make anything like that sort of money doing a job like yours.I know everybody (not other bricklayers)seems to think that 1000 bricks a day per man is normal going.Of course they forget that to achive anything like this you probably have set up the previous day (no pay)and have a labourer to pay and the normal "hidden" costs such as insurance ,worker's comp ,tools,vehicles etc etc.Alot of us still work legal and include these costs in our margin.Maybe a fair bit of money does pass through our hands but the end result is about average I reckon.I think the ideal situation would be to get someone to do the job on the hour and you labour on him,that would give you some insight into the job and should get it done at a reasonable price.
Regards
-
17th April 2006, 08:58 AM #13
Originally Posted by encino_
Have a nice day - Cheers
-
17th April 2006, 10:12 AM #14
Originally Posted by Wood Butcher
I think you will have trouble actualy getting someone to do a crappy little job like that.
Laying through studs is a pain, maybe you should ask the chippy to pay the brickie seeing as how the chippie done the job the easiest way out for himself.
Good luck with it though.
Al
-
17th April 2006, 10:46 AM #15
Do yourself a favour encino, if at all possible pop the frame out so the brickie can get in there first. As it is it's a s.hit of a job which explains the quotes you're getting.
or make a offer to the neighbours too good to refuse to get the fence out of the way.Cheers
Wayne