Starting from the Beginning
Hi all.
I thought i would share my Shed from concept to reality(well it will be real inside the next 2 months)
Stage 1/ Getting Town Planning,after she held the meeting i heard through the grapevine that i had prelimary approval,
as soon as i did the 300 Odd Jobs i had put off for the last year i could purchase Shed,
i wrestled with the usual suspects (totalspan,titan,shedco,ranbuilt) and came to a common denominator,if the shed was going to get done one of these 4 would get the job,
now as i started this project last October,i started finding out what i could and could not do.as i am in Brisbane City Council the rules are not all that strict.as a matter of fact i feel they are easy to deal with apart from donating 942 dollars (542 for relax clause,400 normal charge) so they would let me put the shed up on my boundry,
yes thats right you have to pay 542.00 INC GST so they will let you have the relaxation,now only 1 shed company told me i need to pay the 942.the rest only budgeted for the 400.
so finally, trying to decide which company would supply the colorbond the way i wanted it.i went with who i felt comfortable with and one that could meet my expatations.
first contact with shed people was in late November 2005.finally i had all 4 qoutes by 1st week March 2006
why some companies advertise on television,then when you call them to come for Qoute they never show up is beyond me.i would imagine its not cheap to market yourself during primetime.so they need to ask some questions of their sales force.
anyway here we are 16th april and slab was meant to be done last week.but guess what,yep you guessed right,they decided to do it after Easter,of course i will not be here as work duty calls and i will be away i tryed to postpone but they said not an option.
so i hope my plans for dust collection work out.i have decided to put all collection pipes under slab. as well as 3 phase Table saw power.
i will update the photos as they come through and right up to the fitting out stage.
this shed has been a lifelong ambition,and quite honestly i cant wait to have 1 room in the house that i can call my own.
with 3 girls in the house the only other thing i own is my clothes.
the Shed is 6x4 mts 2.7 high.
i plan for the following tools
Trupro 12"Cab saw
Delta Thicknesser
Carbatec 12"Jointer
Taiwanese 21" Bandsaw
Drill Press
Homemade Vertical Rip Saw
Router attached to Saw,with some Incra stuff to be added when i get 6 numbers.
also i would like a drum sander ,but as ive done for last 25 years i will continue on by hand .
as for dust collection,
truthfully i am stumped,as you can see from the photo i am putting in the ducting 100MM PVC,
i have read about the 150MM and looked at many sites as to what is best.
so while i dont like to ask to many about this,im sure some of you will be able to give me some real thoughts on what size Collector i should buy.
i had thought of making 1 and to be honest i could not be tossed,by the time i gather all the bits,i could have bought 1 from anyware that im sure many of you will tell me can do the job
also i want to install an overhead filter,barfridge,aircond,and an old computer i have been saving,so that can login to net read forum,and all that stuff.
anyway this is where its at for now.
regards A1