Ok I found this thread with a google search after I tried unsuccessfully to "do a search" : http://www.woodworkforums.ubeaut.com...ad.php?t=25438
Anyway I have a similar question to Cliff's. I am about to run a new service from the boundary supply to a new meter board. All three phase.
1. The first run is 100m - this is from the supply to the meter box which will supply the following runs. I'm guessing I need 100A in total.
2. The second run is 30m - this is from the meter to the house. (50A I guess)
3. The third run is 80m - this is from the meter to the shed and office sub board. (50A I guess)
The advice I have received so far has varied from 16mm2 to 25mm2.
I was thinking of using the following
1. 25mm in the first run
2. 16mm in the second run
3. 16mm in the third run.
Another question. I was considering running the gas line at the same time. Can you put the electrical and gas in the same 450mm wide trench. It will be 600mm deep.