G'day all. Began laying the Tas Oak T&G 85 x 19 mm overlay floor today.
The first board was tricky getting it nice and straight. I ran a chalk line the length of the room (8.5 metres) and glued nailed the first run down. then waited 30 mins for the glue to 'go off' a bit then started the next run.
Secret nailing using a Bostich floor stapler. Air type you belt with a special hammer. Brilliant. I'm also using Sikaflex T55 flooring adhesive, spread on with a notched trowel. I've stopped for a drink and I've done 4 runs of 8.5 metres. Now i've got the hang of it i reckon i'll finish laying it tomorrow afternoon. 46 runs to go. 391 lineal metres.
Cheers ;)