well you have about
43.5m of 150mm x 150mm = 0.52 m3
72 m of 100 x 50 = 0.36 m3
36m of 125 x 75 = 0.35 m3
360m of 100 x 25 = 0.9 m3
144m of 100 x 38 = 0.52 m3
160m of 150 x 50 = 1.2 m3
144m of 75 x 38 = 0.4 m3
144m of 125 x 50 = 0.55 m3
total = 4.8 cubic meters of sawn timber
recovery of 50-65% = 8 cube of logs
8 cube x $190/ log cube = $1520 (youd get it for $180/ cube being a forum member)
684m of 175mm x 25mm x 6mm wheatherboards = 4.56 m3
recovery of 40 - 50% = 9 cube of logs
9 cube x $190/ long cube = $1710 (youd get it for $180/ cube being a forum member)
total $3240
and if ya cant get 20 cube of logs at the gate for a coupla grand then theres sompthing rong. good mill logs are worth a maximum of $150/cube and thats only if tehy are top notch.