It's much easier to put the ducting in before you clad the walls. It can be done after but obviously takes longer. We got our mate to come around after the frame was finished to install the ducting and the switch wires. He came back after the plaster was up and the walls were painted to fit the connection point covers and install the unit. You'll also need a 240 volt outlet near where you want to install the unit.