Tiling under a toilet suite
The floor tiling is moving slowly towards that spot where the close coupled toilet suite (Caroma Opal) will reside.
What is the recommended method of tiling and installing the WC. Should I just tile the whole floor and forget the dunny for now or should I leave a couple of tiles off under the toilet to let her grip the floor and be more stable? Tiles are a bit smooth and was worried that the bog under the pan may not hold too well??
Any advice welcome
cheers
Installing Coroma Opal Close Coupled Toilet suite
Thanks Doog,
I have taken care to get the floor level where the pan will sit so that should not be an issue.
Found the technical sheet on the unit and it appears to indicate there are 2 fixing options -
1. Bedding in 3:1 sand cement mix to a depth of 60mm OR
2. Screw fixing using a Caroma Screw fixing kit and acetic cured silicone sealant
I will get the plumber back to fit the toilet and connect the water and waste outlet. Was just wondering if I should tile the floor under it first. Option 2 the screw fixing sounds like the go and I could take your advice and mark out and pre drill the fixing holes in the tiles before laying them.
Both the waste pipe position and water supply inlet are correctly located so that is one less thing to worry about.