Well a month has passed by quickly. I have been busy working every day but there is not a huge amount to show.
School thankfully finished for Summer 2 weeks ago so I have more time (and energy) for the house build. It doesn't start again until the beginning of February next year.
One of the first things I did was to redo one of the lounge room beam covers:
Attachment 533845
When I finished the plasterboard cover the first time, and base-coated the shadowline beading in I noticed that one of the sides was not quite straight and had a slight bulge along it. At first I thought it was not significant enough to worry about, but every time I looked at it I couldn't NOT see it!!
So I had to rip it all off and redo it. I'm so glad I did as I am much happier with it now.
It, and the other one have their top coat of plaster and need a light sanding before painting.
Attachment 533846
The other part I mainly worked on was getting the 2 lounge room cupboards built. I am running out of space ATM to store things in so I really wanted these cupboards finished first so I could hide a lot of the stuff that is getting in the way. It will make finishing the lounge a lot easier.
This is how they were:
Attachment 533847
First, block in the
Attachment 533848
Install the sliding doors:
Attachment 533849
Attachment 533850
Attachment 533852
Remove the doors to paint:
Attachment 533851
Then after insulating and lining the ceilings, I've just finished the plastering and sanding and have begun painting them.
One has both undercoats done, then I ran out of undercoat, and after a quick trip to town this morning for more paint, the other has the first undercoat.
Attachment 533853
You can see the mess I am working around in the lounge:
Attachment 533854
On top of tool shelves, scraps of plasterboard, ladders, work table - there is also the kitchen island and a very large box holding 2/3rds of my new sofa (the other third, plus new coffee table, new dining chairs and rug are currently choking up the guest bedroom!
I had thought about a month ago, that I would be basically finished by December 31st. (Not completely finished as there are quite a few small things that are not urgent - like carpet for the bedrooms, small cupboards to be built etc) All the messy stuff (plastering and painting would be done and I could lift the cardboard from the floor and put in the sofa, coffee table, rug, more artworks etc. This is the point at which i would consider I've finished. Any other work could be done outside on the deck so as not to make a mess indoors.
But we are having an extremely wet Summer. Lots of storms and rain, 100% humidity at times - and this has slowed me down as the plaster is taking longer to dry as is each coat of paint. But I am still optimistic of reaching that finishing point in a couple of weeks.