Grey toughened supergray glass
I mentioned earlier that I would try and post some pics to show how well the windows work.
We think they're great, but they definitely need blinds at night.
Almost finished lounge room
This is the fireplace side of the new lounge room.
The room is all but painted and plastered. It's come up all right considering the number of butt joins in the ceiling. And if you are doing butt joins - then do them by the book - it actually works, my only difference was to really spread the top coat out past the flat - just to give me something to work with.
We have used downlights through all the extension because the ceiling is slightly lower than the existing house at 2700mm and we felt hanging lights would crowd us a bit. Sadly we couldn't use the fluoro downlights because they just don't pump out enough light.
The unpainted and uncorniced bit is where we are waiting for the new fireplace. We paid for it some 10 weeks but are still waiting for it to turn up. Because it is new fireplace in Australia it still needs some official approvals which are a bees dick away. Either way I felt it better to wait until I actually had the thing before I tried finishing off the plaster, cornice and paint.
The fireplace is an Escea 850 and is made in NZ