Originally Posted by
rick_rine
The final column was poured today with the help of my eight year old son who tapped and tapped with me. I had been wary of tapping too much as I was concerned about the cement separating. I am not so concerned now as all the WWF advice has been to tap, tap and tap, also I have heaps of cement in the mix and I have not experienced the cement seperating in this job so far. The mix has been increased to 1:2:6 water, cement, aggregate. This, to me, is a 1:3 mix. Twice the strength of my normal, general purpose, concreting. The posts are very flexible and I am slightly concerned about this. I might need to put diagonal bracing on the structure, but it is just to hold up a vine.
I think the posts are too high and with the major project I think I will lower it by 150 mm.