Hi Larry
Thanks for the info but there was no attachment.
Currently the only machinery I have is a bandsaw, Triton workbench and router table and some moveable benched on wheels so I donlt think the loads will be too much.
Printable View
Hi Larry
Thanks for the info but there was no attachment.
Currently the only machinery I have is a bandsaw, Triton workbench and router table and some moveable benched on wheels so I donlt think the loads will be too much.
Hey bro, I am trying to attach the file, but it is 700kb long, and the attachment bit will only take 100 kb. Do you know any other way to attach it.
Hi Larry
So that I could get the ball rolling as fast a possible, I decided to get a framing company to make up a number of floor frames in modular form so that all I had to do was to lay them down, bolt them together and level everything correctly.
Well, I laid them down and have levelled around the outside of all of the "modules" starting from the highest spot of the slab and dyna bolted them to the slab. I used a digital level (these are great!). I have used fibro for the majority of the packing and also used some plastic "wedgies".
I am pretty sure that I have the levels around the outside correct and now I want to know what is the best way (and hopefully a fast way) to get the levels correct in the centre. Just to remind you, the slab is 6m x 10m and I will be laying 21mm T & G Plywood flooring and I have the joists running along the 6m. I also had the framing company put in noggings. Do I use a string line or some other method?
Thanks a lot for
any help you can provide
Regards
Greg