Hi Doogie
Sorry to hear u have been unwell.
Well the bathroom is not really finished yet. The shower screen has been a nightmare. They measured and cut one panel incorrectly and I asked that it be replaced which they are currently undertaking. They have been very good indeed about it but it is taking time to do.
Bathroom is operational otherwise just chasing a few things to finish it off like another double towel rail, a wall mounted toilet brush(awaiting delivery), a small stainless steel pedal tidy bin, wall mounted soap dispensor and glass holder, wall mounted hair dryer holder and another electric toothbrush. Have not decided about leadlight panels for the window yet.
The underfloor heating looks like it is going to be a big winner from the testing I have done. I will wait until the weather chills out before giving a final verdict on that one though. Same with the heated mirror - need some cold weather to really test it out.
IXL Silhoutte is great both in terms of heat and the exhaust fan.
The Rinnai 26 plus HWS is just fantastic. I have started using this shower rather than the ensuite as I can control the temperature to perfection.
Attached are photos I have just taken 5 minutes ago.
Attachment 70405Attachment 70406Attachment 70407
I have put glad wrap on the glass screens to keep them cleaner as the small one will be chucked and the other one will be eventually treated with Enduro Shield which they kindly gave me.
Whilst everyone has differing ideas on colour schemes the bathroom functions very well and is a massive improvement over what it was originally.
All up with the new 50metre sewer run, new gas and water mains, Rinnai 26 plus HWS and bathroom fitout it will end up costing near $15,000 which was the original budget figure. My labour would be at least that again but I chose to not count that.
Cheers