Here's one for the builders out there. Perhaps Mick can explain this to me.
The block at the rear of my place was recently cleared to prepare for what I think will be 4-5 units. After clearing, they dug trenches about 600mm deep, and I presumed they were for the foundations. However, along came a pile driver and proceeded to drive 7 metre long treated pine posts into the ground in what looked like random positions in the trenches. On average they were about 3 metres apart.
Having driven them in to the point where they were level with the top of the trench, they then took a chainsaw and cut them off so there was only about 150mm still showing above ground. They then placed reinforcing mesh in the trenches and poured the concrete. They are now doing the brickwork.
I have never seen this before and I really can't work out what purpose the pine posts serve. Any ideas anyone ? :confused: