I thought I would start a thread as I am tempted to post this in the thread “Tradies you gotta love them“ but it’s getting off the track of the original post
The scenario in question has happened a few times but the current one is a worry and I’m interested in seeing what comments I get back from Trades people and consumers
Ok I’m a self Employed Electrical Contractor
In this instance I was contacted by a kitchen /bathroom installer with the deal I would invoice the home owner.
This is a normal arrangement and I have no problem with this
But when I was originally contacted I was told it was around 4 hours work from experience when someone stated how long it usually means twice that.
Now understanding we have very stringent regulations we have to ahear to (Yes we can be fined and/or lose our licence if we don’t)
When I arrived on the job the kitchen installer said all I had to do is put power point in the cable has already been run.
Nothing was compliant so it was rip it out and re do.
Then the oven was wired on the same circuit so I installed a new circuit for the oven
Then there were some lights to be installed in a bulkhead then some under a cupboard.
This all happened over a few days.
Then there was the bathroom to have some work in I was told just replace the PowerPoint and get an ixl tastic and install it the wires are already there as there was one there previously.
So up in the ceiling I go to discover very old wiring that has no earth.
So another 2 days of putting a new circuit in for the Tastic and a few Power points (Indecently the original Power Point position was legally to close to the spa so it was repositioned other side of the doorway)
I was there late one night when the home owners come home from work and I discussed the job was going to cost a fortune and it might have been cheaper in the long run to just rewire the house the wife replied Yeah we know most of the power points are not earthed.
The wife then said well we just spent all this money on a new kitchen and bathroom we don’t want the house to burn down.
The husband looked a little concerned as he asked for a ballpark figure that I replied I have to work it out and then asked if I could replace the white power points and switches I just installed with black ones!
I am not there everyday as I am travelling 2 hours to get to the job
Apparently the home owner asked the installer a few days later for a round about figure the Electrical work was up to when he replied around $2000 the home owners almost fainted.
Now when I arrived the next time to finish the job I was told the bathroom was to dark and some light need to be installed above a mirror.
Now my dilemma and the reason for the post is what do I charge.
I’ve been there a total of 6 -8 hour days.
I charge as all Electricians $80 an hour plus GST
This means the job so far comes to over $4000 plus materials.
And there’s more to be done
But I would realistically charge 6 hours a day
But this still comes to over $3000
This in my opinion is a lot of money for the work done but seeing as I’ve been there so many days I’ve lost work else where, but everything is compliant and legal.
As I mentioned this has happened before but it was the home owner threw the extra things in.
At the end of the job I was accused of milking the job (As if) I had other jobs to go to why would I wast time on one.
Anyway I reluctantly settled out of court for half the amount owing.
The thing people don’t seem to understand is wires don’t magically crawl down walls and when we have to sign Compliant certificates we have to make sure that its compliant we have rules and regulations for a reason.
And some of us (Me included) like to have some pride in our work.
So the question I ask is what you would do in my position bearing in mind business operating costs and a family to feed.