Getting a slab done at the moment for a 6m x 6m steel shed and thought it would be a good idea to run the conduit in through the slab rather than put it in afterwards.
Just wondering what the best size to run would be. Keep in mind want to run a fair few power points. say 8 double power points, 240volts 10a and some 15a, lighting etc.
Basically just want to make sure the conduit is large enough to accomodate but not too large.
Also what are the regulations regarding depth. By the way the distance isn't that far, there is a shed behind to hook into. about 1.5 metre away
I want to run a new fuse box in the new shed. Generally is there one main feed line that will care of the lights and power points or is there a few?
Any advice would be good.
Thanks