Hi Guys just an apprentice here but was wondering if anyone had any formulas for working out concrete by hand (mixer) for post holes and slabs.
How many 40kg bags are to a m3 if ratio is 6:1
How much Builders mix would I need for a m3 of concrete
My boss once told me that if you took a 300mm x 300mm post hole x 8m that would be 1m3 of concrete, anyone know this or something similiar?
thanks guys look forward to hear some tips