Hi. I am about to tile a bathroom floor however the level of the bottom of the tile is about 25-35mm from the current floor level (concrete slab). Waht is my best option? Should I lay a "new" bed first (sand and cement) or can I use a sand/cement mixture, maybe with an adhesive additive, and lay the tiles direct as I build up the level? Suggestions appreciated.