Roughing in electrical/plumbing in slab
Hopefully a question the sparkies and plumbers can answer quickly. I haven't done this before so not sure of the answer.
I'm probably 4 or 5 weeks away from putting the slab down for my shed. I'd like to have the electric conduit and water/drain run through the slab instead of through the wall. I haven't organised a sparky or plumber as yet.
Who would normally organise the putting in of the conduit/drains when the slab is being formed up or poured? Who do I need to organise and when for this work to be done?
I'm looking to have conduit run in for electricity. 2 or 3 in floor mounted powerpoints (in the middle of the workarea with covers). Looking to run mains water in and a drain for a sink going out.