hi,
Have started putting up battens on 900 cts roof trusses. The roof is about 9.4m long and I have 3.2m lengths of 90x45 for the battens. How are the battens spliced/joined when the join is not over a truss? Im hoping that there is a way to join the battens when they dont meet over the truss as otherwise I will have a lot of wastage.
Also I cannot find any spec for the spacing of the battens? The roof is a simple gable and the sloping section is about 4m.
Thanks
greg