I am currently undertaking an extension to my house, a double garage with a couple of rooms above.
I have poured the slab and note that the engineer has specified a threaded rod in both front corners from the top plate right down into the slab (I would have to chemical it in) - this would be a length of rod about 6 metres long
Is this really necessary? Wouldn't hoop iron secured through 8 or 10 courses of the piers be sufficient?
Any thoughts
Mac