Bracing off treated pine sleepers.
Fellow forumites,
Attached are three photos of the area a client wants me to deck over including around the tree. The drop to ground is only 650 - 700mm.
I was going to wall ledger off the treated pine sleepers with suitably sized coach screws. And for extra reinforcement maybe even add housed out (coach screwed into the TP also) mini-posts on all the corners of the area.
The framework is not an issue. Just double checking the wall ledger theory around the perimeter. Not keen on digging because of the roots but realise there will have to be one stirrup in the corner which leads into the back of the pool infront of the pavers in pic 3.
By the way, the retained area is filled with soil and crushed rock so sleepers ain't moving and the I-section and C-section for the retaining wall is sitting 1 metre into the ground.
What do ya think?
Dr - 307.:?