Trying to find some specifications DPC
Hello, I've just had some concreting done which isn't the minimum depth below the DPC. In places it's above it
I've been told by the guy from the local council that it must be a minimum of 50mm when undercover or 75mm not under cover and wouldn't pass a building inspection but I want to show this to the guy who says he's never heard of it.
I've been searching the net and can't find these facts anywhere, I would be really grateful if somebody could point me in the right direction.
Thanks.