Filling in steep driveway center.
Hello,
I've got a driveway with two concrete strips and dirt in the middle - which I'm about to fill in. It's really steep (use low range in the ute). Although it's 1.5m3 which would ordinarily warrant a truck - It's 20m long so I don't reckon I can get that all levelled in one go (given the steepness - and how long it's been since I've laid a slab). So are planning on getting cement bags and aggregate and sand (about to check the prices - assuming that it's cheaper buying it seperate) - and will do it in 4 strips mixing myself.
So a couple of questions:
-I would like as high a slump as I can and still have it workable, but not really sure how to go about that, have only ever mixed concrete for standard applications (have helped lay a real steep driveway before but it was trucked concrete).
- how much quicker is using a mixer - have done both barrow and mixer but it's been a while. Setting up a mixer on the drive is another matter.
- haven't checked out the reo sizes but was planning on using around 50mm*100mm squares - given it's not real wide (750mm)
Cheers,
Mike.