Originally Posted by
Art Martin
Just out of interest, what sort of footings would be required for the bricks if I bricked then filled with concrete? I'm looking at 1metre high. About 5 steps.
On the other hand it would be a fair amount of concrete if I simply levelled the site to flat and formed the steps from straight concrete.... so I'd say a brick "frame" would be the most economical, then fill the gaps. But you'd obviously have to build a footing for each step. Any way around this? Perhaps partly fill with compressed soil?