I'm building a deck in my courtyard which has a concrete entry step extruding into it at the level of the concrete slab the house is sitting on.
I've heard that you shouldn't have the top of the deck above the level of the floor inside to avoid water and flooding problems. I was considering having the joists level with the concrete step and running the decking timber over the concrete step concealing it below. This would mean the top of the decking timber sits above the concrete slab inside, but it is below the door frame so should let in any water if the door frame is properly seal.
What do people recommend? Should i remove the concrete step and run the top of the decking below the level of the concrete slab inside? Or should i keep the step and run the decking timber over the step?
Attached are a couple of pics to explain what i mean.