New home concrete stumps how to?
I have read the Alan Staines manual on how to put them in but am a little confused:?
1 Set up hurdles and peg out stump locations no problem here
2 Drill holes no problem here
3 Pour concrete to bottom of hole to depth on plan.problem here
4 Place stumps in holes and aligned to string lines problem here
5 Backfill hole with concrete.no problem here
My questions :?
How is step 3 acheived in reality?
Is step 4 performed while step 3 is wet?
What is a typical depth and width used for say M and H class soil
I understand stumps arent that great for H type soil and so would be bigger.
Wouldnt it be easier to set up the bearers on temporary props and bolt all the stumps to the bearers then just pour each stump once?
Any advice much appreciated!
cheers Rileyp