ill post some more pics when the villaboard goes up and install the spa cheers
Printable View
ill post some more pics when the villaboard goes up and install the spa cheers
after 4 months the bathroom reno has finshed just waiting on my shower screen here are some pics of the water proofing and the finshed room cheers
Looks good - you must be glad it is done after 4 months in progress. I noticed the floor waste near the spa - does the whole floor slope to there? The space looks pretty big.
yes i made sure it slop to the waste when i screed the floor the room is 4.5 meters long and 3metres wide cheers
Wow! A real swing-a-cat bathroom!! I'll just put this in front of hubby.:D
thanks i got a qoute of a bathroom reno mob hey qoute me between 20 and 25 grand to do my bathroom all up cost me 6grand done most of the work myself expect the plumbling
wow thats great love the little touches like the border tiles in the middle of the other tiles now can we see the rest of your house lol:U:U
Excellent job Cabman!
I'll be tackling a bathroom reno soon. May I ask what type/brand water proofer you used?
the water proof i used was gripset 1st i used a primer and then put a 70 bandage all around the floor and in the shower area and the internal in the shower as well gave it 3 coats
Beautiful work. $6000 is amazing. I would have thought the spa, shower screen, tiles alone would cost that much without the plumbing.
Well done indeed.
u can save alot when u do it yur self thats why it took so long to finsh lol
Top job cabman!
What have you been doing to have a tub for the last 4 months,no deodorant is that good!:2tsup:
in laws mate lol next week should have my shower screen
just got my shower screen installed here are some pics