Gap between floor and plaster board
I have just put up wet plaster board for my bathroom reno. The walls will be tiled. The problem is there is 30mm gap between the bottom of the plaster and the floor (I used standard 2 * 1.2 m sheets but obviously the floor to ceiling distance is 2.5m). I think this will be too big a gap even after the ac cement and floor tiles are laid. I cant have tiles overhanging the plaster by 30 mm can I (the tiles are 200 mm * 100 mm)? Do I just run a 30 mm strip of plaster around the bottom so the tiles have something to go onto? I guees I'll have to double it up because ac cement is half the thickness of plaster isnt it?
Really appreciate your advice.
thanks
krakatoa