Laying Floorings-Concrete Preparation
Hi,
Just moved into a new house. We bought 160m2 of hardwood floorings we will install ourselves as a floating floor.
We bought the Bunnings Floating floor installation DVD. It's pretty good and explains it pretty well.
My questions is, I'm trying to get the concrete floor even, according to the DVD I shouldn't have more than 3mm of play at the end of a plank for 2 metres of length of flooring. I've got a real hard time figuring what a hole and whats a bump in the concrete. I've got self-leveling cement to fill holes and I've got a grinder to cut bumps but really the more I grind, the more the bump seems to move in other directions but I still can't get the floor level.
What do I do?? :? Does is really matter if there's more than 3mm of play in the planks once they're laid on top of the foam sub-floor?
Should I just pour self-levelling concrete everywhere and pray it'll magically make the whole floor flat?