Originally Posted by
Bleedin Thumb
I take it that your brother in laws was not inside a shed.
If it was they would have trouble with accessing all around the slab with a 2m long screed.
I also assume they had a bull float with a nice long handle for finishing off - which, whilst not impossible, would be a PITA operating from the doorway of a shed
The other thing is (from memory) every time I've ordered a shed (4 or 5 now) the supplier has requested that I have the slab prepared beforehand so I would assume that it would cost more for them to assemble if you didn't have a slab in place. Is that right?