setting timber stumps in concrete
Hello all,
the plan for our major addition calls for treated pine 150mm round stumps to be set in 800 deep x 450 wide holes and set in concrete.(inc. 200 mm concrete below the stumps) Just wondering if anyone has any ideas about the best way to do it? I'm thinking of mixing enough concrete for the 200mm and just enough to set the post ( maybe 100-150mm?), I can do this in groups over say, a week ( there are 60 holes!) and then get a readymixed delivery to backfill the remaining 600mm in each hole.
Does this sound reasonable or are there better ways. ( I don't have a team of helpers on hand!) Thanks in advance.