Originally Posted by
meerkat
Hi Browny,
ours is just off the deck so to speak. :p
We put posts in as per the recommonded spacing into cement as required.
Then the bearers went on (treated pine) then the joists on top of them.
The whole deck sits on top of the bearers & joists which needs one step to get onto the deck.
Sorry about the lack of detail but if you want them just let me know.
Basically structually, its what is required whether its just off the ground or a metre off. I wanted to make sure that the council would have no problems if they wanted to have a look.
My dad says its over engineered but it will last, right down to the tar on the areas that would get wet from the spa.:D
Regards
Andrew