Originally Posted by johnc
Get in touch with the company you bought the shed from and get their recommendations first. I assume you have a building permit for this thing so you might like to get in touch with whoever issued the permit and find out the minimum specs. I would prefer to put the slab down first but many get the shed up and pour later, both have there advantages. To be honest you have left this a bit late you should have thought this through long before you were ready to put the footings in.
John