Do I Fill Cavity In Concrete Block Up To Floor Level Help?
Took The Previous Advice From You Guys On My Garage Foundations And Dug Out Proper Trench Footings,due To The Slope Etc I'll Have Two Or Three Course Of Concrete Blocks(double Skin With 100mm Cavity) Before I'm Up To Floor Level,should The Cavity Between The Blocks Be In Filled With Something Or Will The Metal Ties Be Sufficien To Stop The Outer Back Fill And Concrete Floor Pushing Them In On Each Other?i'm Using Dense Concrete Blocks 440mm X 22mm X 100mm.
Raring To Go But Don't Want Any Blunders At This Stage.
Thanks In Advance Guys.