When framing up a wall - should a noggin support the join between the wall sheets - i.e 1200mm from the floor where the 2 horizontal sheets meet? My studs are at 500 centres and have 2 nogs between the top & bottom plates, but not at where the sheets meet. Without them will the join crack? Hope this makes sense.
Cheers