Hi All,
I'm about to build a brick retaining wall on concete footings. The footings run out about 30mm from horizontal over their length. I need to level this out in the first course of bricks. Simplest way I guess is to use the mortar bed, but this would mean it would be about 40mm thick at the lowest point, which might be too thick? On the other hand I don't want to try and shave a few mm off a load of bricks. All advice very welcome.
Cheers, Clive.