I plan to jack up some of my bearers and attempt to level my floor.
My house was built in 1973. The sub floor seems to be permanently dry. The bearer levels seem to be out by 1cm to 2 cm's. Is it ok to jack them one by one say 5mm at a time. I plan to use a long plastic tube full of water for my levels. Can any one give an outline of how they would proceed. thanks