Another question about lifting items
In a week or two we will be having two split system air conditioners fitted. One is 8hp and the other is 5hp, so they are both large units. The outdoor units will be lifted onto brackets at the rear of the house, 3 meters off the ground. I had assumed that the air conditioning installer would handle this, but I’m now thinking maybe he will be expecting me to arrange for them to be lifted up. If he does, I’ll have no idea how to arrange it. I’ll know for sure what he is expecting when he rings me in a day or two, but I’d like to have a bit more background before we discuss it.
So my question is - how best to lift a large unit 3 meters off the ground, with no vehicular access and no winch point above the location? How is this usually done ?
Cheers
Arron