I need to lay a path between a house and a retaining wall. The path is about 900mm wide, however I am not sure about ensuring levels and so on? I wont have any form work to level the stuff off against? Should I run a screed long ways? Should I have some sort of division between the concrete and the retaining wall? Will I have lamb or beef for tea tonight? What am I to do?
Cheers