Ahhhhh WSL. 6 draw backs stacked and scms the Wrong Side of the Line. Ahhhhhhhh :o:~:no:
6 too short boards.......
Printable View
Ahhhhh WSL. 6 draw backs stacked and scms the Wrong Side of the Line. Ahhhhhhhh :o:~:no:
6 too short boards.......
Didn't X the waste side?
I feel your pain. I usually set up stops, but even that has led to six pieces 10mm short! :doh:
worked with a bloke. after second week on the job we called him 10 as he was invariably 10 over or 10 under
I know the pain.
Building an aluminum fence that was powder coated. Client wanted a different color so I painted enough lengths to do the fence. On site each length was cut down in pairs. Miss read tape measure and cut two, too short. :(( Had to use two unpainted lengths and paint after installation.
I also know the pain. Morticed both ends of a rail, then had to cut a recess in between. Went to lunch and came back. Brain fade and the first cut went the full length, straight through the mortises!