Posting a question for a mtae. He has 31m of retaining wall 900mm high double brick. The engineers plans call for a footing 600 wide 500 deep with reo top and bottom and bars coming up between the bricks concrete in the middle. He's looking at 10k. A question for all who may want to voice an opinion.
How about getting the dirt battered back at 45 then putting in a treated pine retaining wall with gal steel UB posts, then putting a single face brick wall in front on footing. Crushed rock on the other side of the wall and a garden bed on top.
Your thoughts and comments please.