I am trying to level a site so I can build a shed. The shed will be 6m by 3.5 m. I am having great trouble getting the site level. I did have a olant operator come in some time ago before we did some other building. However I wasn't there to supervise and the site was not level. I am not able to find this operator now. As the shed will have a dirt floor I want it to be level. I may put a concrete floor down later but this will have to wait for a while. My problem is as I dig it out I always to have the high side higher? Can anyone tell me how I can make sure the area is level from front to back and from side to side?
Many thanks
Charles Castle