Hi guys.. hoping someone could help me out with the installation of a second hand cubby house I purchased.
It all seems pretty straight forward to put together but the dilemma I'm facing is getting the base level. The base is going on top of 600mm 90x90 treated pine stilts, and it is going to be sitting on a concrete slab (Which isn't level). Hence the problem.. what's the easiest way to get the base level without flipping it over a hundred times to play with the length of the stilts? I've probably got maybe an inch fall in the concrete from front legs to rear.
Any help will be greatly appreciated.
Wacker